General Information
Other name(s): | Tunnel routier du Lioran |
---|---|
Beginning of works: | 1839 |
Completion: | 1848 |
Status: | out of service |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Le Lioran, Laveissière, Cantal (15), Auvergne-Rhône-Alpes, France |
---|---|
Above of: |
Lioran Rail Tunnel (1868)
|
Will be replaced by: |
New Lioran Road Tunnel (2007)
|
Coordinates: | 45° 4' 58" N 2° 44' 22" E |
Technical Information
Dimensions
width | 6.50 m | |
clear interior profile | 5.30 m x 4.50 m | |
tunnel length | 1 414 m | |
number of lanes | 2 x 1 | |
number of tubes | 1 |
Cost
cost of construction | French Franc 640 000 |
Chronology
30 September 1839 | Laying of the cornerstone. |
---|---|
16 November 2007 | Used as service tunnel and escape route for the New Lioran Tunnel |