General Information
Other name(s): | Tunnel ferroviaire du Lioran |
---|---|
Beginning of works: | 1865 |
Completion: | 1868 |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Railroad (railway) tunnel |
Location
Location: |
Le Lioran, Laveissière, Cantal (15), Auvergne-Rhône-Alpes, France |
---|---|
Part of: |
|
Underneath of: |
Lioran Road Tunnel (1848)
|
Near: |
Le Lioran Water Tower (1867)
|
Coordinates: | 45° 4' 39" N 2° 43' 51" E |
Coordinates: | 45° 5' 22" N 2° 44' 57" E |
Technical Information
Dimensions
tunnel length | 1 958 m |
Participants
Engineering
- Wilhelm Nördling (engineer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le Patrimoine de la SNCF et des chemins de fer français (2 Tomes). Flohic Editions, Paris (France), pp. 193. (1999):
- About this
data sheet - Structure-ID
20010106 - Published on:
02/09/2003 - Last updated on:
28/05/2021