General Information
Other name(s): | East End Bridge |
---|---|
Beginning of works: | April 2011 |
Completion: | 18 December 2016 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Cable-stayed bridge with semi-fan system |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Louisville, Jefferson County, Kentucky, USA Jeffersonville, Clark County, Indiana, USA |
---|---|
Crosses: |
|
Coordinates: | 38° 20' 34.93" N 85° 38' 36.80" W |
Technical Information
Dimensions
total length | 762 m | |
pylons | height | 91 m |
stay cables | number of cables | 104 |
weight | ca. 1 000 t |
Quantities
structural steel | 6 670 t | |
reinforcing steel | 4 960 t |
Materials
pylons |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Owner's representative
Concessionaire
Design
-
International Bridge Technologies, Inc.
- Benjamin Soule (designer)
-
Jacobs Engineering Group Inc.
- Marcos Loizias (designer)
Structural engineering
-
International Bridge Technologies, Inc.
- Benjamin Soule (Engineer of Record)
-
Jacobs Engineering Group Inc.
- Marcos Loizias (Engineer of Record)
Co-contractor
Stay cables
Bearings
Expansion joints
Relevant Web Sites
Relevant Publications
- Cable stays selected for Ohio River bridge pair. In: Bridge Update, n. 65 (January 2007), pp. 1.
- (2021): Construction of the Lewis and Clark cable-stayed bridge over the Ohio River. Presented at: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021, pp. 103-110.
- Not just hot air. In: Bridge Update, n. 51 (April 2005), pp. 4.
- About this
data sheet - Structure-ID
20017218 - Published on:
13/08/2005 - Last updated on:
24/01/2018