Lewis and Clark Bridge
- Cable stays selected for Ohio River bridge pair. In: Bridge Update, n. 65 (January 2007), pp. 1.
- (2021): Construction of the Lewis and Clark cable-stayed bridge over the Ohio River. Presented at: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021, pp. 103-110.
- Not just hot air. In: Bridge Update, n. 51 (April 2005), pp. 4.