General Information
Other name(s): | Nottingham Station Bridge |
---|---|
Beginning of works: | 10 April 2012 |
Completion: | 27 July 2015 |
Status: | in use |
Project Type
Function / usage: |
Tramway, light or metro rail bridge |
---|---|
Structure: |
Warren type truss bridge |
Construction method: |
Longitudinal launching |
Material: |
Steel bridge |
Function / usage: |
Elevated metro or light rail station |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nottingham, Nottinghamshire, East Midlands, England, United Kingdom |
---|---|
Near: |
Nottingham Station (1904)
|
Coordinates: | 52° 56' 50.15" N 1° 8' 44.13" W |
Technical Information
Dimensions
span lengths | 2 x 52.120 m | |
number of spans | 2 | |
on-center distance between girders | 14.530 m | |
truss | height | 6 m |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
piers |
reinforced concrete
|
foundations |
reinforced concrete
|
truss |
steel tubes
|
Participants
Design
-
Mott MacDonald
- Brian Duguid (designer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Nottingham Station Bridge, UK. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 80-81. (2010):
- Tram extension follows historic bridge line. In: Bridge Design & Engineering, v. 16, n. 58 (1st Quarter 2010), pp. 57.
- About this
data sheet - Structure-ID
20055360 - Published on:
16/03/2010 - Last updated on:
05/02/2016