0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2012
Completion: 24 October 2018
Status: in use

Project Type

Location

Location: , ,
Part of:
Coordinates: 22° 14' 55.63" N    113° 39' 0.85" E
Show coordinates on a map

Technical Information

There currently is no technical data available.

Case Studies and Applied Products

Expansion joints for the Jianghai Bridge

Expansion joints for the Jianghai Bridge

Presently, the 35 km long Hong Kong-Zhuhai-Macao Bridge (HZMB) is being constructed over the Pearl River Delta. Since 2009 the HZMB is under construction and planned to be opened for traffic in the autumn of 2017. One of many technical c ... [more]

Hong Kong-Zhuhai-Macao Bridge resists laminar flows with Tuned Mass Dampers

Hong Kong-Zhuhai-Macao Bridge resists laminar flows with Tuned Mass Dampers

Presently, and starting from Hong Kong, the 35 km long Hong Kong-Zhuhai-Macao Bridge is being constructed over the delta of the Pearl River. The bridge steel decks are exposed to laminar flows caused by wind ... [more]

Participants

Expansion joints

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20068187
  • Published on:
    04/01/2016
  • Last updated on:
    19/10/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine