General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Double T-section girder bridge |
Construction method: |
Span-by-span in-situ casting on falsework |
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Obernberg am Inn, Upper Austria, Austria Bad Füssing, Passau (Kreis), Bavaria, Germany |
---|---|
Crosses: |
|
Coordinates: | 48° 19' 20.69" N 13° 19' 40.89" E |
Technical Information
Dimensions
width | 11 m | |
deck depth | 2.12 - 2.72 m | |
total length | 382.5 m | |
main spans (2x) | 62 m | |
span lengths | 35 m - 37 m - 40 m - 43.5 m - 52.00 m - 2 x 62 m - 52 m | |
number of spans | 8 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Initial construction (1963-1965)
Client
Design
Structural engineering
Checking engineering
Contractor
Recalculation to current codes
Client
Structural engineering
Checking engineering
-
KMP ZT - GmbH
- Hermann Hintringer (checking engineer)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20071078 - Published on:
11/04/2016 - Last updated on:
12/04/2016