0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Talbrücke Hirschfeldtal
Official designation: BW 44
Beginning of works: 1994
Completion: 1997
Status: in use

Project Type

Structure: Box girder bridge
Construction method: Incremental launching
Function / usage: Motorway bridge / freeway bridge
Material: Prestressed concrete bridge

Location

Location: , , ,
Carries:
  • Autobahn A4
Part of:
Replaces: Hirschfeld Viaduct (1937)
Coordinates: 51° 2' 44.77" N    13° 20' 15.42" E
Show coordinates on a map

Technical Information

Dimensions

main span 33.70 m
total length 2 x 159.50 m
span lengths 29.15 m - 3 x 33.7 m - 29.25 m
number of spans 5
bridge surface 6 061 m²
total width 38 m
deck deck depth 2.48 m
deck width 2 x 19.25 m

Quantities

deck concrete volume 15 400 m³

Cost

cost of construction German Mark 14 000 000
cost of construction per m² German Mark 2 155

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20006245
  • Published on:
    15/10/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine