General Information
Other name(s): | Talbrücke Hirschfeldtal |
---|---|
Official designation: | BW 44 |
Beginning of works: | 1994 |
Completion: | 1997 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Construction method: |
Incremental launching |
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Nossen, Meißen (Kreis), Saxony, Germany |
---|---|
Carries: |
|
Part of: | |
Replaces: |
Hirschfeld Viaduct (1937)
|
Coordinates: | 51° 2' 44.77" N 13° 20' 15.42" E |
Technical Information
Dimensions
main span | 33.70 m | |
total length | 2 x 159.50 m | |
span lengths | 29.15 m - 3 x 33.7 m - 29.25 m | |
number of spans | 5 | |
bridge surface | 6 061 m² | |
total width | 38 m | |
deck | deck depth | 2.48 m |
deck width | 2 x 19.25 m |
Quantities
deck | concrete volume | 15 400 m³ |
Cost
cost of construction | German Mark 14 000 000 | |
cost of construction per m² | German Mark 2 155 |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Client
Original design
Alternative design
Structural engineering
Checking engineering
- Josef Eibl (checking engineer)
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 77-82.
- About this
data sheet - Structure-ID
20006245 - Published on:
15/10/2002 - Last updated on:
05/02/2016