General Information
Project Type
Function / usage: |
Road bridge Tramway, light or metro rail bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Location
Location: |
Rabat, Rabat-Salé-Kénitra, Morocco Salé, Rabat-Salé-Kénitra, Morocco |
---|---|
Replaces: |
Moulay Al Hassan Bridge (1957)
|
See also: |
Pont de la base nautique (2011)
|
Coordinates: | 34° 1' 38" N 6° 49' 10" W |
Technical Information
Dimensions
total length | 330 m | |
span lengths | 21 m - 26 m - 31 m - 36 m - 76 m - 36 m - 31 m - 26 m - 2 x 23 m | |
number of spans | 10 | |
total width | 46 m | |
deck | width | 14.5 m - 11.5 m - 14.5 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Design
-
Marc Mimram Ingénierie
- Marc Mimram (designer)
Architecture
-
Marc Mimram Ingénierie
- Nathalie Kreib (project leader)
- Aldo Turchetti (project leader)
- Fabien Mauduit (project leader)
Structural design
-
Marc Mimram Ingénierie
- Jacques Durst (project leader)
- Răzvan Ionică (project leader)
Construction engineers
Contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2017): Infrastructure to Create Value. Presented at: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin), pp. 36-42.
- About this
data sheet - Structure-ID
20060401 - Published on:
22/06/2011 - Last updated on:
05/02/2016