General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Double T-section girder bridge Multi-span continuous girder bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Movable Scaffolding System |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Würgau, Scheßlitz, Bamberg (Kreis), Bavaria, Germany |
---|---|
Carries: |
|
Next to: |
Hangbrücke Würgau (1993)
|
Coordinates: | 49° 58' 58.66" N 11° 5' 15.93" E |
Technical Information
Dimensions
total length | 403.00 m | |
span lengths | 26.00 m - 9 x 39.00 m - 26.00 m | |
deck width | 16.85 m | |
number of spans | 11 | |
bridge surface | 6 790 m² | |
girder depth | 2.00 m |
Quantities
concrete volume | 8 900 m³ | |
prestressing steel | 196 t | |
reinforcing steel | 1 050 t | |
total length of piles | 990 m |
Cost
cost of construction | ca. Euro 8 500 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. In: (2017): 27. Dresdner Brückenbausymposium., ISBN 978-3-86780-510-0, pp. 187-202. (2017):
- About this
data sheet - Structure-ID
20072988 - Published on:
12/05/2017 - Last updated on:
01/06/2017