Beginning of works: 1 June 1976
Completion: 1 November 1980
Status: in use

Project Type

Function / usage: Motorway bridge / freeway bridge
Material: Steel bridge
Support conditions:
Plan view: Structurae Plus/Pro - Subscribe Now!
Structure: main bridge:
Non-parallel chord truss bridge
Material: Structurae Plus/Pro - Subscribe Now!
Structure: approach viaduct:
Deck truss bridge
approach viaduct:
Parallel-chord truss bridge

Awards and Distinctions

1984 award winner  

Location

Location: , , ,
, , ,
Crosses:
  • Hudson River
Carries:
  • NY Route 52
  • Interstate I-84
Next to: Hamilton Fish Newburgh-Beacon Bridge (1963)
Coordinates: 41° 31' 11.83" N    73° 59' 49.07" W
Show coordinates on a map

Technical Information

Dimensions

main span 305 m
total length 2 374.1 m
clearance 41.1 m

Materials

truss steel

Case Studies and Applied Products

TENSA®FINGER RSFD – Cantilever finger joints

TENSA®FINGER RSFD – Cantilever finger joints

The RSFD Cantilever Finger Joint consists of massive steel edge profiles with finger plates that are connected to the lower construction on either side of the bridge gap.

[more]

Chronology

1 November 1980

Opening.

Participants

Initial construction (1976-1980)
Design
General contractor
Steel construction
Steel erection
Expansion joint replacement
Expansion joints

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20000542
  • Published on:
    21/11/1999
  • Last updated on:
    02/11/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine