0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: January 2020
Completion: 2022
Status: under construction

Project Type

Location

Location: ,
Coordinates: 56° 13' 22.03" N    121° 26' 43.08" W
Show coordinates on a map

Technical Information

Dimensions

piers height ca. max. 50 m
number 12

Materials

piers reinforced concrete
abutments reinforced concrete
girders steel

Case Studies and Applied Products

Special Bearings for the Halfway River Bridge in Canada

Special Bearings for the Halfway River Bridge in Canada

Spherical bearings are not very widespread in Canada. However, high superimposed loads, a large temperature difference, and unusual challenges during the construction phase led to MAURER developing modified MSM® spherical bearings for th ... [more]

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20082789
  • Published on:
    02/05/2022
  • Last updated on:
    02/05/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine