General Information
Project Type
Structure: |
Triple girder bridge |
---|---|
Function / usage: |
Road bridge |
Support conditions: |
for registered users |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
British Columbia, Canada |
---|---|
Coordinates: | 56° 13' 22.03" N 121° 26' 43.08" W |
Technical Information
Dimensions
piers | height | ca. max. 50 m |
number | 12 |
Materials
piers |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
girders |
steel
|
Case Studies and Applied Products
Special Bearings for the Halfway River Bridge in Canada
Spherical bearings are not very widespread in Canada. However, high superimposed loads, a large temperature difference, and unusual challenges during the construction phase led to MAURER developing modified MSM® spherical bearings for th ... [more]
Participants
Owner
Co-contractor
Bearings
Expansion joints
Construction supervision
Relevant Web Sites
- About this
data sheet - Structure-ID
20082789 - Published on:
02/05/2022 - Last updated on:
02/05/2022