General Information
Name in local language: | Grenobler Brücke |
---|---|
Completion: | 2017 |
Status: | in use |
Project Type
Structure: |
Through truss bridge Continuous truss bridge |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Structure: |
Warren type truss bridge Parallel-chord truss bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
upper deck: Tramway, light or metro rail bridge lower deck: Bicycle and pedestrian bridge |
Location
Location: |
Innsbruck, Tyrol, Austria |
---|---|
Crosses: |
|
Part of: | |
Next to: |
Grenoble Bridge (1975)
|
Coordinates: | 47° 16' 29.12" N 11° 25' 57.36" E |
Technical Information
Dimensions
total length | 98 m | |
span lengths | 28.85 m - 44.00 m - 28.85 m | |
number of spans | 3 | |
abutments | number | 2 |
lower deck | cycleway width | 3.50 m |
piers | number | 2 |
upper deck | width | 6.50 m |
number of tracks | 2 |
Cost
cost of construction | Euro 4 440 000 |
Materials
piers |
reinforced concrete
|
---|---|
truss |
steel
|
upper deck |
reinforced concrete
|
lower deck |
steel
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20089647 - Published on:
27/10/2024 - Last updated on:
27/10/2024