0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: August 1998
Completion: April 1999
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Mittellandkanal
Part of:
Replaces: Gollstrasse Bridge (1957)
Coordinates: 52° 22' 2.99" N    9° 51' 28.13" E
Show coordinates on a map

Technical Information

Dimensions

span 60.00 m
total width 17.50 - 19.00 m

Cost

cost of construction German Mark 7 700 000

Materials

deck composite steel-reinforced concrete

Chronology

August 1998

Construction begins.

November 1999

Completion.

April 2000

Opened to traffic.

Participants

Client
Original design
Architecture
Checking engineering
Main contractor
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008723
  • Published on:
    21/03/2003
  • Last updated on:
    20/07/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine