0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1 September 1925
Completion: 29 June 1928
Status: demolished (9 June 2017)

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Arthur Kill
Replaced by: Goethals Bridge (2018)
Coordinates: 40° 38' 9" N    74° 11' 49" W
Show coordinates on a map

Technical Information

Dimensions

main span 204.8 m
total length 2 164.1 m
clearance 41.1 m
number of lanes 4
main bridge
length 351.1 m

Cost

cost of construction United States dollar 7 200 000

Materials

truss steel

Participants

Owner
Bridge engineering
Design
Design consultants
Consulting engineers

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001772
  • Published on:
    18/08/2001
  • Last updated on:
    27/12/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine