General Information

Beginning of works: May 2014
Completion: 21 May 2018
Status: in use

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Arthur Kill
Replaces: Goethals Bridge (1928)
Coordinates: 40° 38' 7.79" N    74° 11' 50.37" W
Show coordinates on a map

Technical Information

Dimensions

total length 2 225 m
number of lanes 2 x 3
walkway width 3.05 m
vertical navigation clearance 42.2 m
horizontal navigation clearance 152.4 m
eastern approach viaduct
total length 850 m
main bridge
main span 274.3 m
span lengths 58 m - 112 m - 274.3 m - 112 m - 48 m
number of spans 5
pylons height 83 m
western approach viaduct
total length 776 m

Materials

piers reinforced concrete
pylons reinforced concrete
deck of main bridge composite steel-reinforced concrete
deck of approach viaducts prestressed concrete

Participants

Owner
Wind tunnel testing
Technical advisor to the owner
Structural engineering
Checking engineering
Co-contractor
Steel construction

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20066545
  • Published on:
    07/10/2014
  • Last updated on:
    27/12/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine