General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
High-speed rail tunnel |
Construction method: |
New Austrian Tunnelling Method (NATM) |
Location
Location: |
Ingolstadt, Bavaria, Germany |
---|---|
Part of: | |
Coordinates: | 48° 50' 35.66" N 11° 27' 35.71" E |
Coordinates: | 48° 49' 10.33" N 11° 26' 1.20" E |
Technical Information
Dimensions
tunnel length | 3 289 m | |
tunnel section area | 124-148 m² |
Materials
tunnel structure |
reinforced concrete
|
---|
Chronology
1 January 1999 | Beginning of construction. |
---|---|
December 2003 | Expected completion (originally planned for 2001). |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- NBS Nürnberg-Ingolstadt. Knackpunkte in der Abwicklung der Tunnelobjekte. In: Felsbau, v. 17, n. 5 ( 1999). (1999):
- Das Paläokarstrelief der südlichen Frankenalb und seine Ingenieurgeologische Auswirkung in der offenen Bauweise des Tunnels Geisberg. In: Felsbau, v. 23, n. 1 ( 2005), pp. 48. (2005):
- Tunnel Geisberg - Nürnberg-München in einer Stunde. In: Porr-Nachrichten, n. 138 ( 2001), pp. 31-40. (2001):
- Verwitterungserscheinungen an Kalksteinen und Dolomiten des Tithon und ihre Auswirkungen auf den Vortrieb des Tunnels Geisberg. In: Felsbau, v. 23, n. 1 ( 2005), pp. 59. (2005):
- About this
data sheet - Structure-ID
20003964 - Published on:
24/06/2002 - Last updated on:
28/05/2021