General Information
Name in local language: | Talbrücke Geigerhaid |
---|---|
Official designation: | BW 453a |
Beginning of works: | March 2016 |
Completion: | December 2018 |
Status: | in use |
Project Type
Structure: |
Double T-section girder bridge |
---|---|
Material: |
Prestressed concrete bridge |
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Span-by-span in-situ casting on falsework |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Parsberg, Neumarkt in der Oberpfalz (Kreis), Bavaria, Germany |
---|---|
Address: | A 3 |
Carries: |
|
Replaces: |
Geigerhaid Viaduct (1970)
|
Carries: |
A 3 Motorway (Germany) (1984)
|
Coordinates: | 49° 10' 49.29" N 11° 42' 15.41" E |
Technical Information
Dimensions
total length | 212.35 m | |
span lengths | 29.175 m - 4 x 40 m - 23.175 m | |
number of spans | 6 | |
bridge surface | 6 604 m² | |
number of lanes | 2 x 3 | |
piles | diameter | 1.50 m |
superstructure | deck depth | 2.20 m |
deck width | 31.10 m |
Quantities
concrete volume | 12 000 m³ | |
prestressing steel | 170 t | |
reinforcing steel | 1 270 t | |
piles | total length of piles | 625 m |
Cost
cost of construction | ca. Euro 14 000 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Geotechnical survey
Checking engineering
- Dietrich Oehmke (checking engineer)
Contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2019. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2019, pp. 35-48.
- Chronik des Brückenbaus. Presented at: 29. Dresdener Brückenbausysmposium, 11./12. März 2019, Dresden (Germany), pp. 197-208. (2019):