• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Share

Follow

Geigerhaid Viaduct

General Information

Name in local language: Talbrücke Geigerhaid
Official designation: BW 453a
Beginning of works: 2016
Completion: 2018
Status: in use

Project Type

Location

Location: , , ,
Address: A 3
Carries:
  • Autobahn A3
Replaces: BW 453 (1970)
Carries: A 3 Motorway (Germany) (1984)
Coordinates: 49° 10' 49.29" N    11° 42' 15.41" E
Show coordinates on a map

Technical Information

Dimensions

total length 212.35 m
span lengths 29.175 m - 4 x 40 m - 23.175 m
bridge surface 6 604 m²
number of lanes 2 x 3
total width 31.10 m
piles diameter 1.50 m
superstructure deck depth 2.20 m

Quantities

concrete volume 12 000 m³
prestressing steel 170 t
reinforcing steel 1 270 t
piles total length of piles 625 m

Cost

cost of construction ca. Euro 14 000 000

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Wellner, Sabine (2019): Chronik des Brückenbaus. Presented at: 29. Dresdener Brückenbausysmposium, 11./12. März 2019, Dresden (Germany), pp. 197-208.
  • About this
    data sheet
  • Structure-ID
    20077192
  • Date created
    04/04/2019
  • Last Update
    04/04/2019