General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Prestressed concrete bridge |
Construction method: |
Incremental launching |
Structure: |
Box girder bridge Multi-span continuous girder bridge |
Location
Location: |
Eichenzell, Fulda (Kreis), Hesse, Germany |
---|---|
Crosses: |
|
Part of: | |
Next to: |
Fuldatalbrücke Eichenzell (A66, 2001) (2001)
|
Replaces: |
Fuldatalbrücke Eichenzell (A66, 1966) (1966)
|
Supports: |
A 66 Motorway (Germany)
|
Coordinates: | 50° 29' 20.82" N 9° 41' 52.52" E |
Technical Information
Dimensions
total length | 480 m | |
span lengths | 8 x 42.0 m - 41.14 m - 42.80 m - 38.92 m - 20.90 m | |
number of spans | 12 | |
height above valley floor or water | ca. 10.00 m | |
roadway / carriageway width | 11.50 m |
Cost
cost of construction | Euro 4 800 000 |
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20066818 - Published on:
09/02/2015 - Last updated on:
05/02/2016