0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Fuldatalbrücke Eichenzell (A66, 2005)

General Information

Beginning of works: July 2004
Completion: October 2005
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Fulda River
Part of:
Next to: Fuldatalbrücke Eichenzell (A66, 2001) (2001)
Replaces: Fuldatalbrücke Eichenzell (A66, 1966) (1966)
Supports: A 66 Motorway (Germany)
Coordinates: 50° 29' 20.82" N    9° 41' 52.52" E
Show coordinates on a map

Technical Information

Dimensions

total length 480 m
span lengths 8 x 42.0 m - 41.14 m - 42.80 m - 38.92 m - 20.90 m
number of spans 12
height above valley floor or water ca. 10.00 m
roadway / carriageway width 11.50 m

Cost

cost of construction Euro 4 800 000

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20066818
  • Published on:
    09/02/2015
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine