General Information
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Meerbusch, Rhein-Kreis Neuss, North Rhine-Westphalia, Germany Düsseldorf-Lohausen, Düsseldorf, North Rhine-Westphalia, Germany |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Coordinates: | 51° 16' 41.22" N 6° 42' 17.64" E |
Technical Information
Dimensions
main span | 287.500 m | |
total length | 1 286.50 m | |
span lengths | 7 x 64.20 m - 6 x 63.00 m - 287.50 m - 8 x 63.00 m - 55.20 m | |
number of cables | 80 | |
clearance | 9.10 m | |
number of spans | 11 | |
bridge surface | 48 887 m² | |
deck | deck width | 38.5 m |
pylon | pylon height | 81.00 m |
Quantities
structural steel | S 355: 7 180 t S 420: 520 t |
|
concrete volume | 23 900 m³ | |
concrete volume | 32 700 m³ | |
prestressing steel | 1 900 t | |
reinforcing steel | 1 700 t | |
reinforcing steel | 3 825 t | |
steel for cable-stays | 410 t |
Cost
cost of construction | German Mark 160 000 000 |
Materials
cables |
steel wire
|
---|---|
piers |
reinforced concrete
|
deck of main span |
steel
|
pylons |
steel
|
deck of approach viaducts |
prestressed concrete
|
Chronology
11 September 2001 | The joining section is shipped and lifted into place in the middle of the Rhine. |
---|---|
31 May 2002
— 2 June 2002 |
Opening celebrations. |
31 May 2002, 11:00 | Official opening by Federal Transport Secretary Kurt Bodewig. |
3 June 2002, 06:00 | Bridge opens to regular traffic. |
Notes
The pylon design was governed by the need to keep the height low as the bridge is near the flight-paths of the Düsseldorf airport.
In 2000 a contest was held asking the citizens of the cities and counties of Düsseldorf, Neuss, Mettmann, Krefeld and Mönchengladbach to submit names for the new bridge. The name "Niederrheinbrücke" obtained the most submissions and was going to be adopted, however the Federal Transport Secretary decides to name the bridge "Flughafenbrücke" (Airport Bridge) instead.
Participants
-
Ingenieurbüro Grassl GmbH Beratende Ingenieure Bauwesen
- Manfred Grassl (structural engineer)
- Leonhardt, Andrä und Partner
- Meyer + Schubart (superstructure)
- Brückenbau Plauen
- Dyckerhoff & Widmann AG
- Ed. Züblin AG
- Eiffel Construction Metallique
- Heilit-Wörner Bau AG
- Johannes Dörnen Stahlbauwerk GmbH & Co. KG
- S.E.H. Stahlbau Engineering Hannover
- Walter Bau AG
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A 44 Rheinquerung Ilverich. Ein bedeutender Lückenschluß geht voran. brochure.
- Ausbau der BAB A 44 - mehr als eine Brücke. Flughafenbrücke - Lückenschluss der BAB A 44 im Norden Düsseldorfs. In: Beton-Informationen, n. 4 ( 2003), pp. 63. (2003):
- Brücken in Deutschland für Straßen und Wege. Der Fotobildband deutscher Brückenbaukunst. Deutscher Bundesverlag, Cologne (Germany), ISBN 978-3-935064-41-5, pp. 158-159. (2006):
- Brücken und Tunnel der Bundesfernstraßen 2002. Deutscher Bundes-Verlag, Bonn (Germany), 2002, pp. 37-60.
- Düsseldorf: eine Stadt zwischen Tradition und Vision. Brücken über den Rhein. B.o.s. Druck und Medien, Kleve (Germany), pp. 257-270. (2001):
- About this
data sheet - Structure-ID
20000464 - Published on:
09/11/1999 - Last updated on:
05/02/2016