General Information
Completion: | 1952 |
---|---|
Status: | in use |
Project Type
Structure: |
Pony truss bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Material: |
Steel bridge |
Structure: |
Subdivided Warren truss bridge Continuous truss bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Parallel-chord truss bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Donzère, Drôme (26), Auvergne-Rhône-Alpes, France |
---|---|
Crosses: |
|
Part of: | |
Crosses: |
Donzère-Mondragon Canal (1952)
|
Coordinates: | 44° 24' 43.65" N 4° 42' 33.76" E |
Technical Information
Dimensions
total length | 178 m | |
span lengths | 40 m - 2 x 49 m - 40 m | |
number of spans | 4 | |
number of tracks | 2 | |
abutments | number | 2 |
piers | number | 3 |
truss | number of longitudinal girders | 2 |
Materials
piers |
reinforced concrete
|
---|---|
truss |
steel
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Les ouvrages d'art du canal de Donzère-Mondragon. In: Donzère-Mondragon. La Houille Blanche, Grenoble (France), pp. 301-310. (1955):
- About this
data sheet - Structure-ID
20043836 - Published on:
23/02/2009 - Last updated on:
13/08/2023