General Information
Official designation: | VIA 2969 |
---|---|
Beginning of works: | 2012 |
Completion: | 1 September 2014 |
Status: | completed |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
main bridge: Haunched girder bridge |
Material: |
main bridge: Prestressed concrete bridge |
Structure: |
main bridge: Single-cell box girder bridge |
Construction method: |
main bridge: Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! approach viaducts: Steel-reinforced concrete composite bridge |
Structure: |
approach viaducts: Twin girder bridge |
Location
Location: |
Cubzac-les-Ponts, Gironde (33), Nouvelle-Aquitaine, France Saint-Loubès, Gironde (33), Nouvelle-Aquitaine, France Saint-Romain-la-Virvée, Gironde (33), Nouvelle-Aquitaine, France |
---|---|
Part of: | |
Coordinates: | 44° 57' 4.67" N 0° 27' 12.77" W |
Technical Information
Dimensions
approach viaduct C0-P6 | ||
---|---|---|
main span | 55 m | |
total length | 300 m | |
girder depth | 3.80 m | |
approach viaduct P17-C20 | ||
main span | 55 m | |
total length | 150 m | |
girder depth | 3.80 m | |
main bridge P7-P16 | ||
main span | 100 m | |
total length | 800 m | |
girder depth | 5 - 8.10 m | |
overall structure | ||
total length | 1 319 m | |
bridge surface | 15 828 m² | |
number of tracks | 2 |
Quantities
approach viaducts | ||
---|---|---|
structural steel | 2 200 t | |
main bridge | ||
prestressing steel | 570 t | |
overall structure | ||
concrete volume | 44 000 m³ | |
reinforcing steel | 6 200 t |
Design Loads
overall structure | ||
---|---|---|
design speed | 230 km/h |
Materials
piers |
reinforced concrete
|
---|---|
deck of main bridge |
prestressed concrete
|
deck of approach viaducts |
composite steel-reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Architecture
Construction engineers
- SECOA (approach viaducts)
- Vinci Construction Grands Projets
Steel construction
Special foundations
Prestressing
Form travelers
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Viaduc de la Dordogne - un site et un délai contraints. In: Travaux, n. 912 (January 2015), pp. 30-35. (2015):
- About this
data sheet - Structure-ID
20066708 - Published on:
16/01/2015 - Last updated on:
27/01/2021