General Information
Other name(s): | Rex T. Barber Bridge |
---|---|
Beginning of works: | 1998 |
Completion: | September 2000 |
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Cantilever construction using temporary cable-stays |
Material: |
Reinforced concrete bridge |
Location
Location: |
Jefferson County, Oregon, USA |
---|---|
Crosses: |
|
Replaces: |
Crooked River Bridge (1926)
|
Coordinates: | 44° 23' 35" N 121° 11' 35" W |
Technical Information
Dimensions
total length | 163 m | |
height above valley floor or water | 91.44 m | |
arch | width | 13 m |
rise | 24 m | |
arch span | 124.97 m | |
thickness | 1.25 - 2 m | |
deck | width | 24.16 m |
Materials
arch |
reinforced concrete
|
---|
Chronology
23 March 1998 | Completion of the north springing. |
---|---|
21 April 1998 | Completion of the south springin. |
8 August 1998 | Form traveler erection of the arch begins. |
12 August 1999 | The arch is closed. |
Notes
Arch construction: segmental cast-in-place, with two different form traveler systems.
Participants
Owner
Design
- T. Y. Lin International
-
David Goodyear Engineering Services
- David Goodyear (chief engineer)
Construction engineers
Construction
Stay cables
Form travelers
Construction management
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Respect for tradition - The new Crooked River Gorge Bridge. Presented at: ARCH'01. 3ème conférence sur les ponts en arc, pp. 955-964. (2001):
- About this
data sheet - Structure-ID
20004513 - Published on:
16/08/2002 - Last updated on:
05/04/2020