0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Rex T. Barber Bridge
Beginning of works: 1998
Completion: September 2000
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Crooked River
Replaces: Crooked River Bridge (1926)
Coordinates: 44° 23' 35" N    121° 11' 35" W
Show coordinates on a map

Technical Information

Dimensions

total length 163 m
height above valley floor or water 91.44 m
arch width 13 m
rise 24 m
arch span 124.97 m
thickness 1.25 - 2 m
deck width 24.16 m

Materials

arch reinforced concrete

Chronology

23 March 1998

Completion of the north springing.

21 April 1998

Completion of the south springin.

8 August 1998

Form traveler erection of the arch begins.

12 August 1999

The arch is closed.

Notes

Arch construction: segmental cast-in-place, with two different form traveler systems.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004513
  • Published on:
    16/08/2002
  • Last updated on:
    05/04/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine