Advertisement
Commercial buildings: Case Studies
- Structures
- Buildings
- Buildings by use
- Commercial buildings
Case Studies & Reports
The following reports and case studies on "Commercial buildings" are available:
![](https://files.structurae.net/files/300x200/5228/south-beach-1.jpg)
Forming the new landmark South Beach in Singapore
Singapore is to add another landmark: South Beach combines historic structures with modern, environmentally sustainable highrise architecture. City ... more
![](https://files.structurae.net/files/300x200/5228/jkg-tower-01-peri-300cmyk.jpg)
JKG Tower, Kuala Lumpur: Working faster due to safer conditions
For the construction of the JKG Tower high-rise building complex – consisting of a 32-storey office tower along with a 13-storey parking facility – ... more
![](https://files.structurae.net/files/300x200/5228/doka_2015-07-acquis_plaza_aachen_img01.jpg)
Aquis Plaza Aachen: A major project in the tightest of spaces
The Aquis Plaza shopping center is being built in the middle of Aachen's pedestrian zone and is designed to integrate architecturally and urbanisti ... more
![](https://files.structurae.net/files/300x200/5228/barangaroo-01-peri-300cmyk.jpg)
Barangaroo South, Australia: Construction time optimisation and crane-independent climbing
The new LPS climbing protection panel from PERI provides comprehensive working safety and saves valuable crane time thanks to the mobile climbing h ... more
![](https://files.structurae.net/files/300x200/1/hotel-melia-paris-peri-01.jpg)
All-round enclosure and formwork scaffold for the Hotel Melia at La Défense
For the Hotel Mélia in the "La Defense" office district just outside Paris, Peri has developed a climbing formwork solution that not only provides ... more
![](https://files.structurae.net/files/300x200/1/ansicht_freeport_cadman.jpg)
STRABAG Real Estate and ECE lay foundation stone for "Intelligent Quarters" in HafenCity Hamburg
STRABAG Real Estate GmbH (SRE) and ECE Projektmanagement G.m.b.H. & Co. KG have laid the foundation stone for their project in Hamburg's HafenC ... more
![](https://files.structurae.net/files/300x200/1/donau_city_from_donauinsel_on_2014-08-28.png)
Semi-active dampers respond to various load cases
![](https://files.structurae.net/files/300x200/5180/apa_032_012_cmyk.png)
Design of waterproof structures - AQUIS PLAZA Aachen
In 2003, a new German guideline for "Water impermeable structures made of concrete" was published by DAfStb, which finally provides specifications ... more
![](https://files.structurae.net/files/300x200/1/bildfig_1.png)
Warsaw Spire – Quickly and safely to the top with optimally adapted climbing technology
In Warsaw, the Warsaw Spire office complex is currently being constructed. The 220 m high, waist-shaped office tower complete with elliptical groun ... more
![](https://files.structurae.net/files/300x200/5180/6090_bild1.png)
SCF – self-climbing formwork gets Paris office tower into shape
The French capital is one interesting silhouette richer: The new 171 meter high Tour D2 in the western Paris quarter of La Defense is ready. In a ... more