0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2014
Completion: 1 November 2015
Duration of works: 15 months
Status: in use

Project Type

Awards and Distinctions

2018 award winner  

Location

Location: , ,
Address: Paula-Fuchs-Allee
Crosses:
  • Neckar River
Coordinates: 49° 8' 50.15" N    9° 12' 42.17" E
Show coordinates on a map

Technical Information

Dimensions

main span 47.50 m
width 24 m
total length 87.600 m
number of spans 5
number of lanes 4
roadway / carriageway width 14.00 m
walkway width 2 x 3.95 m
deck span lengths 17.019 m - 17.843 m - 17.958 m - 17.711 m - 17.068 m
deck width 22.90 m
number of longitudinal girders 2

Quantities

structural steel 430 t
concrete volume 1 800 m³

Cost

cost of construction Euro 8 500 000

Materials

foundations reinforced concrete
deck slab precast reinforced concrete (C 35/45)
abutments reinforced concrete
girders steel
portal legs steel

Participants

Owner
Design
Structural engineering
Checking engineering
Contractor
Steel construction
Material supplier
Software

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20071214
  • Published on:
    18/05/2016
  • Last updated on:
    02/11/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine