General Information
Other name(s): | Bandra Worli Sealink Bridge |
---|---|
Beginning of works: | 2000 |
Completion: | 24 March 2010 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Road bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bandra, Maharashtra, India Worli, Maharashtra, India |
---|---|
Coordinates: | 19° 2' 33.98" N 72° 49' 23.95" E |
Coordinates: | 19° 0' 45.52" N 72° 48' 59.98" E |
Technical Information
Dimensions
main spans (2x) | 250 m | |
pylon P19 | height | 126 m |
Case Studies and Applied Products
TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Participants
Owner
Design
Geotechnical engineering
Contractor
Expansion joints
Launching
Relevant Web Sites
Relevant Publications
- Complex climb. In: Bridge Design & Engineering, n. 49 (4th Quarter 2007), pp. 28.
- Cutting congestion. Construction of the Bandra Worli Sea Link across Mahim Bay in Mumbai is due to be completed this year. In: Bridge Design & Engineering, v. 15, n. 54 (1st Quarter 2009), pp. 42-43.
- Double Trouble. In: Bridge Update, n. 38 (September 2003), pp. 4.
- (2013): The iconic Bandra Worli Sealink in the city of Mumbai, India – Construction of the Bandra Cable-Stayed Bridges. Presented at: IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013, pp. 1-8.
- Indian inventory. Key structural elements for the Bandra-Worli Sea Link in India were supplied by local manufaturers. In: Bridge Design & Engineering, v. 16, n. 59 (2nd Quarter 2010), pp. 74.
- About this
data sheet - Structure-ID
20010504 - Published on:
18/10/2003 - Last updated on:
13/04/2016