General Information

Beginning of works: 2019
Completion: 2021
Status: in use

Project Type

Structure: approach viaduct:
Double T-section girder bridge
main span:
Unbraced tied-arch bridge
Support conditions:
Function / usage: Road bridge
Material: approach viaduct:
Prestressed concrete bridge
main span:
Steel-reinforced concrete composite bridge
Plan view: Structurae Plus/Pro - Subscribe Now!

Location

Location: , , ,
Crosses: Dortmund-Ems-Kanal (1899)
Coordinates: 51° 39' 47.51" N    7° 22' 3.91" E
Show coordinates on a map

Technical Information

Dimensions

width 13.80 m
total length 205.00 m
span lengths 38.00 m - 39.00 m - 127.00 m
number of spans 3

Quantities

main span structural steel 7 540 t
concrete volume 1 650 m³
reinforcing steel 300 t
piles total length of piles 520 m
approach viaduct
concrete volume 2 100 m³
prestressing steel 650 t
reinforcing steel 450 t

Cost

cost of construction Euro 16 000 000

Materials

piers reinforced concrete
arches steel
piles reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Wellner, Sabine (2022): Chronik des Brückenbaus. Presented at: 31. Dresdner Brückenbausymposium, 7./8. Juni 2022, Dresden (Germany), pp. 213.
  • About this
    data sheet
  • Structure-ID
    20083089
  • Published on:
    08/06/2022
  • Last updated on:
    08/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine