0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1939
Completion: 1962
Status: demolished (2002)

Project Type

Location

Location: , ,
Carries:
  • Autobahn A1
Replaced by: Aiter Valley Bridge (2003)
Coordinates: 48° 0' 52.59" N    13° 56' 16.26" E
Show coordinates on a map

Technical Information

Dimensions

total length 427.80 m
span lengths 48.30 m - 6 x 55.20 m - 48.30 m
number of spans 8
height above valley floor or water max. 31 m
deck deck width 2 x 14.80 m

Materials

deck prestressed concrete
piers masonry

Chronology

1939 — 1941

Piers are constructed. The superstructure was planned as a steel plate girder bridge, but never completed.

1958 — 1962

Construction of the prestressed concrete superstructure, Europe's longest at the time.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005595
  • Published on:
    29/09/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine