General Information
Project Type
Structure: |
Double T-section girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Sattledt, Upper Austria, Austria |
---|---|
Carries: |
|
Replaced by: |
Aiter Valley Bridge (2003)
|
Coordinates: | 48° 0' 52.59" N 13° 56' 16.26" E |
Technical Information
Dimensions
total length | 427.80 m | |
span lengths | 48.30 m - 6 x 55.20 m - 48.30 m | |
number of spans | 8 | |
height above valley floor or water | max. 31 m | |
deck | deck width | 2 x 14.80 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
masonry
|
Chronology
1939 — 1941 | Piers are constructed. The superstructure was planned as a steel plate girder bridge, but never completed. |
---|---|
1958 — 1962 | Construction of the prestressed concrete superstructure, Europe's longest at the time. |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken / Bridges. Ästhetik und Gestaltung / Aesthetics and Design. 4th edition, Deutsche Verlags-Anstalt, Stuttgart (Germany), pp. 178. (1994):
- Verbreiterung und Tragwerkserneuerung bei der Aitertalbrücke. In: Bauingenieur, v. 79, n. 3 (March 2004). (2004):
- About this
data sheet - Structure-ID
20005595 - Published on:
29/09/2002 - Last updated on:
05/02/2016