General Information
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Sattledt, Upper Austria, Austria |
---|---|
Carries: |
|
Replaces: |
Aitertalbrücke (1962)
|
Coordinates: | 48° 0' 52.59" N 13° 56' 16.26" E |
Technical Information
Dimensions
total length | 427.80 m | |
span lengths | 48.30 m - 6 x 55.20 m - 48.30 m | |
number of spans | 8 | |
height above valley floor or water | max. 31 m | |
abutments | number | 2 |
deck | deck depth | 2.90 m |
deck width | 2 x 14.80 m | |
number of longitudinal girders | 2 x 2 |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
steel
|
Participants
Structural engineering
- Baumann + Obholzer ZT-GmbH (superstructure)
- Kirsch - Muchitsch und Partner, Zivilingenieure für Bauwesen (substructure)
Checking engineering
- M. Wicke (checking engineer)
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Verbreiterung und Tragwerkserneuerung bei der Aitertalbrücke. In: Bauingenieur, v. 79, n. 3 (March 2004). (2004):
- About this
data sheet - Structure-ID
20005596 - Published on:
29/09/2002 - Last updated on:
05/02/2016