General Information
Project Type
| Structure: |
Multi-span continuous girder bridge Slab bridge main bridge: Haunched girder bridge main bridge: Three-span continuous girder bridge |
|---|---|
| Function / usage: |
Railroad (railway) bridge |
| Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
| Location: |
Bitterfeld-Wolfen, Anhalt-Bitterfeld, Saxony-Anhalt, Germany Muldestausee, Anhalt-Bitterfeld, Saxony-Anhalt, Germany |
|---|---|
| Crosses: |
|
| Coordinates: | 51° 39' 9.68" N 12° 20' 14.09" E |
Technical Information
Dimensions
| total length | 269 m | |
| deck width | 11.70 m | |
| piles | diameter | 1.20 m |
| Eastern bridge | ||
|---|---|---|
| span lengths | 30.00 m - 25.00 m - 6 x 16.22 m | |
| number of spans | 8 | |
| main bridge | ||
| span lengths | 25.00 m - 30.00 m - 25.00 m | |
| number of spans | 3 | |
| girder depth | 1.24 - 1.89 m | |
| Western bridge | ||
| span lengths | 5 x 16.22 m - 25.00 m | |
| number of spans | 6 | |
Design Loads
| live load | UIC 71/SSW |
Materials
| deck |
prestressed concrete
|
|---|---|
| piers |
reinforced concrete
|
| piles |
reinforced concrete
|
| abutments |
reinforced concrete
|
Participants
Owner
General designers
Checking engineering
- Klaus Stiglat (checking engineer)
Contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (1998): Ausbaustrecke der DB AG Berlin-Halle/Leipzig - Eisenbahnbrücken im Zuge der Querung der Muldeniederung. In: Beton- und Stahlbetonbau, v. 93, n. 10 (October 1998), pp. 294-299.
- About this
data sheet - Structure-ID
20068217 - Published on:
10/01/2016 - Last updated on:
10/01/2016



