Optimizing time–cost in construction projects using modified quasi-opposition learning-based multi-objective Jaya optimizer and multi-criteria decision-making methods
Author(s): |
Mohammad Azim Eirgash
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Asian Journal of Civil Engineering |
DOI: | 10.1007/s42107-024-01235-1 |
- About this
data sheet - Reference-ID
10808694 - Published on:
17/01/2025 - Last updated on:
17/01/2025