0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Optimizing time–cost in construction projects using modified quasi-opposition learning-based multi-objective Jaya optimizer and multi-criteria decision-making methods

This publication lists 62 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10808694
  • Published on:
    17/01/2025
  • Last updated on:
    17/01/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine