Optimizing time–cost in construction projects using modified quasi-opposition learning-based multi-objective Jaya optimizer and multi-criteria decision-making methods
Auteur(s): |
Mohammad Azim Eirgash
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Asian Journal of Civil Engineering |
DOI: | 10.1007/s42107-024-01235-1 |
- Informations
sur cette fiche - Reference-ID
10808694 - Publié(e) le:
17.01.2025 - Modifié(e) le:
17.01.2025