Mohammad Azim Eirgash
- Development of time-cost trade-off optimization model for Indian highway construction projects using non-dominated sorting genetic algorithm-II methodology. In: Asian Journal of Civil Engineering, v. 25, n. 8 (24 September 2024). (2024):
- Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects. In: Structures, v. 53 (July 2023). (2023):
- Time-Cost Trade-Off Optimization with a New Initial Population Approach. In: Teknik Dergi, v. 30, n. 6 (November 2019). (2019):