0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Development of time-cost trade-off optimization model for Indian highway construction projects using non-dominated sorting genetic algorithm-II methodology

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s42107-024-01157-y.
  • About this
    data sheet
  • Reference-ID
    10791988
  • Published on:
    01/09/2024
  • Last updated on:
    10/11/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine