Development of time-cost trade-off optimization model for Indian highway construction projects using non-dominated sorting genetic algorithm-II methodology
Auteur(s): |
Kandipilli Mehar Kumar
Deepanshu Agrawal Vinod Kumar Vishwakarma Mohammad Azim Eirgash |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Asian Journal of Civil Engineering, 24 septembre 2024, n. 8, v. 25 |
Page(s): | 5975-5988 |
DOI: | 10.1007/s42107-024-01157-y |
- Informations
sur cette fiche - Reference-ID
10791988 - Publié(e) le:
01.09.2024 - Modifié(e) le:
10.11.2024