A new methodology for pre-camber design of a long-span bridge considering dynamic train load and complex environmental effects
Author(s): |
Ruoyu Li
Qinglie He Shengyang Zhu Junfeng Yan Wanming Zhai |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering Structures, March 2024, v. 302 |
Page(s): | 117349 |
DOI: | 10.1016/j.engstruct.2023.117349 |
- About this
data sheet - Reference-ID
10748714 - Published on:
14/01/2024 - Last updated on:
14/01/2024