A new methodology for pre-camber design of a long-span bridge considering dynamic train load and complex environmental effects
Auteur(s): |
Ruoyu Li
Qinglie He Shengyang Zhu Junfeng Yan Wanming Zhai |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering Structures, mars 2024, v. 302 |
Page(s): | 117349 |
DOI: | 10.1016/j.engstruct.2023.117349 |
- Informations
sur cette fiche - Reference-ID
10748714 - Publié(e) le:
14.01.2024 - Modifié(e) le:
14.01.2024