0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Die neue Lahntalbrücke Limburg im Zuge der BAB 3 - Wettbewerb und Entwurf

Author(s):

Medium: journal article
Language(s): German
Published in: Beton- und Stahlbetonbau, , n. 11, v. 111
Page(s): 759-775
DOI: 10.1002/best.201600044
Abstract:

The new bridge over the river Lahn near Limburg as part of BAB 3, Germany - Competition and Design

The effort of the responsible engineers and architects at the Lahntalbrücke Limburg always becomes clear when a new well-designed bridge structure is needed for the representative Lahn valley. To handle the steadily increasing traffic prestressed concrete structures have gained acceptance for both replacement constructions. Both constructions also convince optically through their simplicity while leaving the creative presence of the cathedral in the valley unchanged.

Keywords:
bridges semi-integral pre-stressed concrete
Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/best.201600044.
  • About this
    data sheet
  • Reference-ID
    10074881
  • Published on:
    10/11/2016
  • Last updated on:
    07/12/2016
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine