Die neue Lahntalbrücke Limburg im Zuge der BAB 3 - Wettbewerb und Entwurf
Author(s): |
Annett Nusch
Norbert Nieder |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Beton- und Stahlbetonbau, November 2016, n. 11, v. 111 |
Page(s): | 759-775 |
DOI: | 10.1002/best.201600044 |
Abstract: |
The new bridge over the river Lahn near Limburg as part of BAB 3, Germany - Competition and DesignThe effort of the responsible engineers and architects at the Lahntalbrücke Limburg always becomes clear when a new well-designed bridge structure is needed for the representative Lahn valley. To handle the steadily increasing traffic prestressed concrete structures have gained acceptance for both replacement constructions. Both constructions also convince optically through their simplicity while leaving the creative presence of the cathedral in the valley unchanged. |
Keywords: |
bridges semi-integral pre-stressed concrete
|
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10074881 - Published on:
10/11/2016 - Last updated on:
07/12/2016