General Information
Name in local language: | Lahntalbrücke Limburg |
---|---|
Beginning of works: | 1961 |
Completion: | 30 July 1965 |
Status: | under demolition (2016) |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Limburg an der Lahn, Limburg-Weilburg, Hesse, Germany |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Next to: |
Lahntalbrücke (2001)
|
Replaces: |
Limburg Viaduct (1949)
|
Replaced by: |
Limburg Viaduct (2017)
|
Coordinates: | 50° 23' 18.85" N 8° 4' 46.41" E |
Technical Information
Dimensions
main span | 68 m | |
length | 396.50 m | |
height above valley floor or water | 57 m | |
deck | deck depth | 4.0 m |
deck width | 2 x 15 m |
Cost
cost of construction | German Mark 11 000 000 | |
Demolition | ||
---|---|---|
cost of demolition | Euro 14 100 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Architecture
- Wilhelm Tiedje (architect)
Structural engineering
- Hermann Bay (structural engineer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Der Ersatzneubau der Lahntalbrücke Limburg. Presented at: 26. Dresdener Brückenbausysmposium, 14./15. März 2016, Dresden (Germany), pp. 67-84. (2016):
- Die neue Lahntalbrücke Limburg im Zuge der BAB 3 - Wettbewerb und Entwurf. In: Beton- und Stahlbetonbau, v. 111, n. 11 (November 2016), pp. 759-775. (2016):
- Rückbau der Lahntalbrücke Limburg (1964). Presented at: 28. Dresdener Brückenbausysmposium, Dresden (Deutschland), 12.-13. März 2018, pp. 73-86. (2018):
- Suche nach der geeigneten Lösung. Zu den Ergebnissen von zwei Realisierungswettbewerben. In: [ Umrisse ], v. 8, n. 4 ( 2008), pp. 18. (2008):
- About this
data sheet - Structure-ID
20006204 - Published on:
14/10/2002 - Last updated on:
23/03/2018