Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
Author(s): |
Parviz Ghoddousi
Ehsan Eshtehardian Shirin Jooybanpour Ashtad Javanmardi |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, March 2013, v. 30 |
Page(s): | 216-227 |
DOI: | 10.1016/j.autcon.2012.11.014 |
- About this
data sheet - Reference-ID
10190153 - Published on:
10/12/2018 - Last updated on:
10/12/2018