0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm

This publication has been cited in the following 42 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10190153
  • Published on:
    10/12/2018
  • Last updated on:
    10/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine