Ehsan Eshtehardian
- Using Bayesian Networks for Selecting Risk-Response Strategies in Construction Projects. In: Journal of Construction Engineering and Management, v. 148, n. 8 (August 2022). (2022):
- Cash Flow Forecasting With Risk Consideration Using Bayesian Belief Networks (bbns). In: Journal of Civil Engineering and Management, v. 23, n. 8 (November 2017). (2017):
- A Game Theory Approach for Optimum Strategy of the Owner and Contractor in Delayed Projects. In: Journal of Civil Engineering and Management, v. 22, n. 8 (November 2016). (2016):
- Framework for Proactive Change Management: Assessing the Risk of Change in Construction Projects Using Fuzzy Fault Tree Analysis. In: Journal of Architectural Engineering (ASCE), v. 25, n. 2 (June 2019). (2019):
- Using ANP and AHP for the supplier selection in the construction and civil engineering companies; Case study of Iranian company. In: KSCE Journal of Civil Engineering, v. 17, n. 2 (March 2013). (2013):
- Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm. In: Automation in Construction, v. 30 (March 2013). (2013):
- Fuzzy-based MOGA approach to stochastic time–cost trade-off problem. In: Automation in Construction, v. 18, n. 5 (August 2009). (2009):
- A Multiply Connected Belief Network approach for schedule risk analysis of metropolitan construction projects. In: Civil Engineering and Environmental Systems, v. 33, n. 3 (July 2016). (2016):
- Time–cost optimization: using GA and fuzzy sets theory for uncertainties in cost. In: Construction Management and Economics, v. 26, n. 7 (July 2008). (2008):