0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Time–cost optimization: using GA and fuzzy sets theory for uncertainties in cost

Author(s):


Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 7, v. 26
Page(s): 679-691
DOI: 10.1080/01446190802036128
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446190802036128.
  • About this
    data sheet
  • Reference-ID
    10207486
  • Published on:
    05/12/2018
  • Last updated on:
    05/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine