Ehsan Eshtehardian

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Arabi, Shiva / Eshtehardian, Ehsan / Shafiei, Iman (2022): Using Bayesian Networks for Selecting Risk-Response Strategies in Construction Projects. Dans: Journal of Construction Engineering and Management, v. 148, n. 8 (août 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002310

  2. Khanzadi, Mostafa / Eshtehardian, Ehsan / Mokhlespour Esfahani, Mahdiyar (2017): Cash Flow Forecasting With Risk Consideration Using Bayesian Belief Networks (bbns). Dans: Journal of Civil Engineering and Management, v. 23, n. 8 (novembre 2017).

    https://doi.org/10.3846/13923730.2017.1374303

  3. Khanzadi, Mostafa / Eshtehardian, Ehsan / Chalekaee, Alireza (2016): A Game Theory Approach for Optimum Strategy of the Owner and Contractor in Delayed Projects. Dans: Journal of Civil Engineering and Management, v. 22, n. 8 (novembre 2016).

    https://doi.org/10.3846/13923730.2016.1210222

  4. Abad, Fatemeh / Eshtehardian, Ehsan / Taghizade, Katayoun (2019): Framework for Proactive Change Management: Assessing the Risk of Change in Construction Projects Using Fuzzy Fault Tree Analysis. Dans: Journal of Architectural Engineering (ASCE), v. 25, n. 2 (juin 2019).

    https://doi.org/10.1061/(asce)ae.1943-5568.0000358

  5. Eshtehardian, Ehsan / Ghodousi, Parviz / Bejanpour, Azadeh (2013): Using ANP and AHP for the supplier selection in the construction and civil engineering companies; Case study of Iranian company. Dans: KSCE Journal of Civil Engineering, v. 17, n. 2 (mars 2013).

    https://doi.org/10.1007/s12205-013-1141-z

  6. Ghoddousi, Parviz / Eshtehardian, Ehsan / Jooybanpour, Shirin / Javanmardi, Ashtad (2013): Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm. Dans: Automation in Construction, v. 30 (mars 2013).

    https://doi.org/10.1016/j.autcon.2012.11.014

  7. Eshtehardian, Ehsan / Afshar, Abbas / Abbasnia, Reza (2009): Fuzzy-based MOGA approach to stochastic time–cost trade-off problem. Dans: Automation in Construction, v. 18, n. 5 (août 2009).

    https://doi.org/10.1016/j.autcon.2009.02.001

  8. Eshtehardian, Ehsan / Khodaverdi, Saeed (2016): A Multiply Connected Belief Network approach for schedule risk analysis of metropolitan construction projects. Dans: Civil Engineering and Environmental Systems, v. 33, n. 3 (juillet 2016).

    https://doi.org/10.1080/10286608.2016.1184492

  9. Eshtehardian, Ehsan / Afshar, Abbas / Abbasnia, Reza (2008): Time–cost optimization: using GA and fuzzy sets theory for uncertainties in cost. Dans: Construction Management and Economics, v. 26, n. 7 (juillet 2008).

    https://doi.org/10.1080/01446190802036128

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine