Framework for Proactive Change Management: Assessing the Risk of Change in Construction Projects Using Fuzzy Fault Tree Analysis
Auteur(s): |
Fatemeh Abad
Ehsan Eshtehardian Katayoun Taghizade |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Architectural Engineering (ASCE), juin 2019, n. 2, v. 25 |
Page(s): | 04019010 |
DOI: | 10.1061/(asce)ae.1943-5568.0000358 |
- Informations
sur cette fiche - Reference-ID
10309908 - Publié(e) le:
02.03.2019 - Modifié(e) le:
02.03.2019