0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Ashtad Javanmardi

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Javanmardi, Ashtad / Liu, Min / He, Chuanni / Hsiang, Simon M. / Abbasian-Hosseini, Alireza (2024): Improving Construction Meeting Effectiveness: Trade-Offs between Reactive and Proactive Site-Level Planning Discussions. In: Journal of Management in Engineering (ASCE), v. 40, n. 5 (September 2024).

    https://doi.org/10.1061/jmenea.meeng-6087

  2. Javanmardi, Ashtad / He, Chuanni / Hsiang, Simon M. / Abbasian-Hosseini, S. Alireza / Liu, Min (2023): Enhancing Construction Project Workflow Reliability through Observe–Plan–Do–Check–React Cycle: A Bridge Project Case Study. In: Buildings, v. 13, n. 9 (23 August 2023).

    https://doi.org/10.3390/buildings13092379

  3. Zhang, Yuxiang / Javanmardi, Ashtad / Liu, YanChun / Yang, ShuJuan / Yu, XiuXia / Hsiang, Simon M. / Jiang, Zhihao / Liu, Min (2020): How Does Experience with Delay Shape Managers’ Making-Do Decision: Random Forest Approach. In: Journal of Management in Engineering (ASCE), v. 36, n. 4 (July 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000776

  4. Javanmardi, Ashtad / Abbasian-Hosseini, S. Alireza / Liu, Min / Hsiang, Simon M. (2020): Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach. In: Journal of Construction Engineering and Management, v. 146, n. 4 (April 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001790

  5. Javanmardi, Ashtad / Abbasian-Hosseini, S. Alireza / Liu, Min / Hsiang, Simon M. (2018): Benefit of Cooperation among Subcontractors in Performing High-Reliable Planning. In: Journal of Management in Engineering (ASCE), v. 34, n. 2 (March 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000578

  6. Ghoddousi, Parviz / Eshtehardian, Ehsan / Jooybanpour, Shirin / Javanmardi, Ashtad (2013): Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm. In: Automation in Construction, v. 30 (March 2013).

    https://doi.org/10.1016/j.autcon.2012.11.014

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine