0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Ashtad Javanmardi

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Javanmardi, Ashtad / Liu, Min / He, Chuanni / Hsiang, Simon M. / Abbasian-Hosseini, Alireza (2024): Improving Construction Meeting Effectiveness: Trade-Offs between Reactive and Proactive Site-Level Planning Discussions. Dans: Journal of Management in Engineering (ASCE), v. 40, n. 5 (septembre 2024).

    https://doi.org/10.1061/jmenea.meeng-6087

  2. Javanmardi, Ashtad / He, Chuanni / Hsiang, Simon M. / Abbasian-Hosseini, S. Alireza / Liu, Min (2023): Enhancing Construction Project Workflow Reliability through Observe–Plan–Do–Check–React Cycle: A Bridge Project Case Study. Dans: Buildings, v. 13, n. 9 (23 août 2023).

    https://doi.org/10.3390/buildings13092379

  3. Zhang, Yuxiang / Javanmardi, Ashtad / Liu, YanChun / Yang, ShuJuan / Yu, XiuXia / Hsiang, Simon M. / Jiang, Zhihao / Liu, Min (2020): How Does Experience with Delay Shape Managers’ Making-Do Decision: Random Forest Approach. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 4 (juillet 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000776

  4. Javanmardi, Ashtad / Abbasian-Hosseini, S. Alireza / Liu, Min / Hsiang, Simon M. (2020): Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach. Dans: Journal of Construction Engineering and Management, v. 146, n. 4 (avril 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001790

  5. Javanmardi, Ashtad / Abbasian-Hosseini, S. Alireza / Liu, Min / Hsiang, Simon M. (2018): Benefit of Cooperation among Subcontractors in Performing High-Reliable Planning. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 2 (mars 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000578

  6. Ghoddousi, Parviz / Eshtehardian, Ehsan / Jooybanpour, Shirin / Javanmardi, Ashtad (2013): Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm. Dans: Automation in Construction, v. 30 (mars 2013).

    https://doi.org/10.1016/j.autcon.2012.11.014

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine