0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Influence of the door opening on the pressure transient caused by the high-speed subway train passing through the double-track tunnel with the mid-partition wall

Author(s): ORCID


Medium: journal article
Language(s): English
Published in: Tunnelling and Underground Space Technology, , v. 142
Page(s): 105417
DOI: 10.1016/j.tust.2023.105417
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.tust.2023.105417.
  • About this
    data sheet
  • Reference-ID
    10743229
  • Published on:
    28/10/2023
  • Last updated on:
    28/10/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine