사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안 (Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project)
Author(s): |
Tae-Jea Cho
Jong-Soo Choi |
---|---|
Medium: | journal article |
Language(s): | Korean |
Published in: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), February 2011, n. 1, v. 11 |
Page(s): | 9-17 |
DOI: | 10.5345/jkic.2011.02.1.009 |
- About this
data sheet - Reference-ID
10761909 - Published on:
15/03/2024 - Last updated on:
15/03/2024